American industrial equipment engineering & manufacturing · Since 1991Reps Wanted →262.716.0105Talk with our team →
262.716.0105 262.716.0106 info@panamenv.com Designed and built in the USA since 1991
Pan America Environmental, Inc. — 35 years, made in USA
Transportation & Military250 GPM

Naval Base Bilge Oily Water Treatment Facility (BOWTS)

A shore-side facility at a large naval base treats 250 GPM of bilge and tank runoff water using our integrated BOWTS design, from tanks and pumps to chemical metering and controls.

Industry
Transportation & Military
Flow / scale
250 GPM
Main equipment
BOWTS treatment equipment
Built by
Pan America Environmental, USA
Naval Base Bilge Oily Water Treatment Facility (BOWTS)

01The project

BOWTS Site

To provide a shore side treatment facility at large Naval Base to treat a 250 GPM bilge and storage tank runoff water wastewater the U.S. Navy contracted Pan America Environmental to design and provide a Bilge Oily Water Treatment System (BOWTS) facility based on our BOWTS design. The facility consists of all treatment equipment, storage/EQ/LET tanks, all pumping systems, chemical make down and metering systems. Controls were effected via a PLC & HMI touchscreen control system based on an industrial MCC architecture as is typical for our large integrated BOWTS system designs.

02Equipment supplied

  • BOWTS treatment equipment
  • Storage/EQ/LET tanks
  • Pumping systems
  • Chemical makedown and metering
  • PLC/HMI controls on an MCC architecture

03Have a similar project?

Every system we build starts with the water. Send us your flow rate and what is in it, or ask about lab testing to prove the chemistry first.

04Project photos

Originally published · Updated October 2026

Tell us your flow rate and what's in the water

Our engineers size and configure each system for your facility. Call 262.716.0105 or send the details and we'll follow up with a recommendation and pricing.