01The project
A major, international OEM automotive body parts and parts manufacturer contracted Pan America Environmental, Inc. to lab test samples, design and provide a full treatment system to handle all wastewater from a stamping and machining plant operation.
PAE began the process with jar testing at our in house lab to determine proper chemistry, dose, sludge generation and overall process requirements. After a site visit where the installation location was reviewed for a full system layout design based on system, process and operations requirements, a full facility layout drawing package was produced. Once the process and chemistry were determined the system was designed and installed.
The system consists of:
- Collection/EQ tank, transfer pump
- Oil water separator
- Chemical pretreatment
- DAF
- Effluent solids filtration
- Effluent ZeoMaxx Z200 filtration system
- Dewatering filter press
- Pumping systems
- PLC/HMI control system
Following installation of the system PAE assisted with a successful startup and training.
02Equipment supplied
- Collection/EQ tank and transfer pump
- Oil water separator
- Chemical pretreatment
- DAF
- Effluent solids filtration
- ZeoMaxx Z200 filtration
- Dewatering filter press